Herne Bay Relief Sewer Enabling Works
Weir & AOS supported AT storm recovery, designing resilient, cost-effective water & geotechnical infrastructure solutions.
Weir & AOS supported AT storm recovery, designing resilient, cost-effective water & geotechnical infrastructure solutions.
Weir & AOS supported AT storm recovery, designing resilient, cost-effective water & geotechnical infrastructure solutions.
Weir & AOS supported AT storm recovery, designing resilient, cost-effective water & geotechnical infrastructure solutions.
Weir & AOS supported AT storm recovery, designing resilient, cost-effective water & geotechnical infrastructure solutions.
Weir delivered WDC’s Morningside Flood Mitigation, designing resilient pump station & interceptor network to reduce flood risk.
Weir & AOS supported HEB for ACHW’s Paerata Bridge, delivering civil, hydraulic, & stream stability design.
Miraka Road fire main, upsizing 1.1km pipeline to meet firefighting standards & growth.
Weir supported CSL with hydraulic analysis, flood resilience, and scour assessments for Kakanui Bridge.
Weir supported AT for the Inga Road Bridge, delivering hydraulic modelling & flood risk assessment for design.